Skip to Main Content

VA Medical Center Rehabilitation

Wiegmann installed the energy-efficient HVAC system to serve St. Louis VA Medical Center-Jefferson Barracks’s new $49 million rehabilitation facility, which serves area veterans and their families. The project included all ductwork, insulation and piping that serves the entire rehab facility, including the chapel, basketball court, pool, offices and rec rooms. To achieve the owner’s goal of energy efficiency, the HVAC system for this new facility utilized the existing campus chilled water and steam loops to feed heat into the building. Wiegmann also installed air handling units, fan coil units, air terminal units, unit heaters, exhaust fans, an energy recovery unit, direct heat recovery chiller, heat exchangers and steam humidification.

The limited space available for equipment posed a project challenge, which Wiegmann was able to overcome through careful planning and coordination with other trades.

 

Affiliations

badge for Select Top Subcontractor 2024 award
partner logo stating ISNETWorld Ravs Plus Participant
text logo for Global Gold Chain Alliance with Proud Member label
blue and yellow Controlled Environment Building Association logo with proud member text label
blue and gray text logo Plumbers & Pipefitters Local 562 with pipe image
blue text logo Sheet Metal Workers Local Union #36
blue and yellow Teamsters Local 682 with lion crest