Beverage Distribution Facility
Project Scope
Wiegmann Associates designed the heating and cooling systems to meet the strict temperature requirements of the 110,000 sf fully conditioned warehouse as well as the 30,000 sf, 2-story main office area. Wiegmann also designed a Split DX Refrigeration System to create a 12,500 sf, 35-degree cooler. The design achieved the client’s goal of a cost-effective and energy-efficient HVAC and refrigeration system.
Project Challenge/Solution
The different types of spaces required a variety of temperature and relative humidity design requirements. Coordination between trades was essential to ensure a smooth build on this project. ARCO’s preliminary review process and coordination meetings allowed the project to be a success.