Skip to Main Content

Goldring Gulf Distributing

The project included:

  • 70F CTW and 36F draught cooler
  • HVAC systems for the office, hospitality room, back-in truck loading and maintenance bay

Wiegmann designed and installed HVAC and refrigeration systems for Goldring Gulf to handle the widely varying product loads at the facility and the humid Florida climate. Complicating the design was the fact that this facility is located in an area prone to hurricanes. Our design needed to account for all of these factors while conditioning the warehouse and draught cooler to precise temperature and humidity requirements.

We selected energy-efficient equipment and used energy-conserving measures in the controls systems. The installed rooftop equipment and wall louvers were all Florida product-approved.

 

Affiliations

badge for Select Top Subcontractor 2024 award
partner logo stating ISNETWorld Ravs Plus Participant
text logo for Global Gold Chain Alliance with Proud Member label
blue and yellow Controlled Environment Building Association logo with proud member text label
blue and gray text logo Plumbers & Pipefitters Local 562 with pipe image
blue text logo Sheet Metal Workers Local Union #36
blue and yellow Teamsters Local 682 with lion crest