Skip to Main Content

The Chefs’ Warehouse

  • Installed refrigeration equipment for a -10 degree freezer, 34 degree cooler and cold dock areas
  • Installed DDC control system Completed LEED documentation related to our scope, including the Energy Model
  • Installed VAV system to serve 13,475 sf office space Installed packaged rooftop unit to temper the dry storage area
  • Installed HVAC and exhaust system for test kitchen

The newly built, LEED Certified Chefs’ Warehouse facility in Las Vegas encompasses office space, a fully functional “test” kitchen, -10F freezer, cooler, candy/chocolate cooler space, dry storage and cold dock. All of these spaces have unique temperature and HVAC requirements.

The primary challenge of this project was designing and modeling the building to meet the stringent LEED standards set by the USGBC. Facilities with large process refrigeration loads use a lot of energy, which requires designing the other building systems to be extremely efficient and implementing energy conserving control methods for the refrigeration systems. Our design helped the facility achieve the required energy savings for LEED.

LEED Certified

Affiliations

badge for Select Top Subcontractor 2024 award
partner logo stating ISNETWorld Ravs Plus Participant
text logo for Global Gold Chain Alliance with Proud Member label
blue and yellow Controlled Environment Building Association logo with proud member text label
blue and gray text logo Plumbers & Pipefitters Local 562 with pipe image
blue text logo Sheet Metal Workers Local Union #36
blue and yellow Teamsters Local 682 with lion crest