Project Scope
- Replaced existing HVAC control systems
- Added new supply fans, make-up air units
- Re-controlled existing equipment
- Controlled new equipment
- Demolished existing steam unit heaters
Project Challenge/Solution
The existing HVAC controls and equipment were not effectively controlled to minimize energy consumption or to maintain a comfortable environment. Wiegmann performed an extensive energy audit and engineered a new control sequence for the HVAC systems, which required the addition of new variable speed supply fans, make-up air units, and re-commissioning and control of existing exhaust fans and louvers.
Energy Savings
$300,000 per year Less than three-year simple payback on project