  • Limelight Healthcare Center: Castle Rock, CO


    Client: Limelight MOB, LLC
    Project: New Construction Medical Clinic
    General Contractor: Brinkmann Constructors
    Floor Area: 21,288 sf
    Construction Schedule: April 2017


    Value Engineering


    HVAC Mechanical Contractor


    Wiegmann value engineered the HVAC system, which helped bring the shell and core project within budget.


    In addition to the main rooftop HVAC system, Wiegmann’s solution included 12 terminal units to provide energy-efficient temporary heating and cooling as tenant spaces are built out.

    The two-story Limelight Health Center building, located directly across from Castle Rock Adventist Hospital, will house outpatient therapy clinics for neurology and physical therapy.

    “This project was a good success story for a design-assist project. There was good collaboration between the mechanical contractor, general contractor, owner, architect and mechanical engineer of record to bring costs within budget and make the project a success.”